CLIENT.

Rio Tinto

ERA-1

Placement of multiple portable buildings for box cut operation at ERA’s Ranger Mine, Jabiru. Supply and installation of required services, structural footings, concrete paths and covered walkways. The joint venture between PH Electrical Services and Overland Plumbing NT included:

  • Planning and coordination of works
  • Administration and application of required health and safety system
  • Excavation and concreting in of structural posts
  • Demountable buildings craned into position to form ablutions block complex
  • Concrete walkways formed, poured and finished
  • Post structure and roofing system installed over walkways
  • Installation of electrical services including mains cables, mains switch board, tray work, underground conduits, air conditioning units, external lighting and power
  • Installation of LED lofodlighting on 8m street-light poles for decline works areas
  • Plumbing and drainage to buildings
  • Storm water system including guttering, down pipes and required pits
  • Fire hydrant system.
ERA-2